首页|入太湖污染物通量削减目标下水工程调控优化探究

入太湖污染物通量削减目标下水工程调控优化探究

扫码查看
入湖污染物通量削减,一直是太湖水环境治理工作的重点.新孟河作为现状唯一一条可以直接连接长江与太湖流域上游区域腹部的流域性重要河道,前期工作发现,在新孟河工程实施后,随着引长江清水进入太湖,湖西区主要入湖河道的水质得到明显改善,但总体入太湖的污染物通量也进一步增加.在新孟河工程即将常态化运行的背景下,针对工程运行后湖西区入湖污染物通量仍可能进一步增加的难点问题,通过灵活调整工程调度,合理部署区域产水出路,计划增加沿江口门排水机会,利用新孟河向长江排水,以拉动腹部地区水质差的本地产水由东入太湖转而北排长江,从而有效削减入太湖污染物通量.结果表明:通过优化新孟河工程现状调度,典型平水年(p=50%)时可以通过新孟河排江水量新增4.68 亿m3,湖西区入湖氨氮通量较现状调度方案削减184 t/a、总磷入湖通量削减35.5 t/a,说明优化后的水工程调度方案是利用水利工程调度实现入湖污染物通量削减的可行性措施.相关研究成果可为太湖水环境治理工作提供新的思路.
Optimization of water engineering regulation aiming to reduce pollutant flux into Taihu Lake
The reduction of pollutants flux into lake is the focus of water environment improvement in Taihu Lake.The Xinmeng River Project is the only important river channel that can directly connect the Changjiang River and the inner area of the upper reaches of Taihu Lake Basin.Previous work has found that since the implementation of the project,with the flow diverted from the Changjiang River into Taihu Lake,the water quality of the rivers into the Huxi hydraulic region has been significantly improved,but the overall pollutant flux into Taihu Lake has also further increased.Aiming at this problem after the normal operation of Xin-meng River project,we are about to adjust the projects'dispatch flexibly and arrange water flowing route reasonably,in which we will increase the drainage outlets along the Changjiang River.In detail,we utilize the Xinmeng River to drain the lake water to the Changjiang River so as to promote the hinterland poor quality water to be drained to the Changjaing River,so the pollutant flux in-to the Taihu Lake will be effectively reduced.The results show that by optimizing the current scheduling of the Xinmeng River pro-ject,the amount of water discharged from the Xinmeng River can be increased by 468 million m3 in the typical normal year(p=50%).Compared with the current scheduling scheme,the ammonia nitrogen flux into the Huxi area is reduced by184 t/a,and the total phosphorus flux into the lake is reduced by 35.5 t/a.It shows that the optimized water project scheduling scheme is a feasi-ble measure to reduce the pollutant flux into the lake by using the water project scheduling.The relevant research results can pro-vide new ideas for the water environment treatment of Taihu Lake.

pollution fluxwater conservancy project regulationXinmeng RiverTaihu Lake

秦灏、柳子豪、姚杰夫、唐仁、吴小靖

展开 >

江苏省太湖水利规划设计研究院有限公司,江苏 苏州 215006

南京大学 地球科学与工程学院,江苏南京 210023

污染物通量 水利工程调度 新孟河 太湖

国家自然科学基金江苏省水利科技项目江苏省水利科技项目江苏省水利科技项目

42377073202000820200092023018

2024

人民长江
水利部长江水利委员会

人民长江

CSTPCD北大核心
影响因子:0.451
ISSN:1001-4179
年,卷(期):2024.55(5)
  • 22