首页|传统挡潮闸结构功能优化路径探析

传统挡潮闸结构功能优化路径探析

扫码查看
挡潮闸工程在控制运用过程中一直饱受河流环境生态、河道淤积、工程管理等问题的困扰.在收集整理相关研究成果的基础上,对上述问题产生的原因进行了系统性梳理和分析,初步厘清了各要素间的互动关系,并据此提出了相应的技术解决方案,且对方案的可行性进行了分析和探讨.研究表明:① 河流生态环境受损、河道淤积、工程管理等问题间存在密切的内在联系,属与挡潮闸相关的工程伴生问题;② 传统挡潮闸工程简单的结构功能造成了对河流的过度控制,是上述伴生问题产生的主要原因;③ 以提升闸门启闭切换效率为抓手,提出对传统挡潮闸工程实施双闸门控制,并对工程软件操作系统进行智能化升级,能够对前述各类工程伴生问题起到缓解作用,具有一定的技术可行性.
Optimal path analysis on structural function of traditional tidal gates
China's tidal gate projects have been plagued by problems such as river environment ecology,river siltation,and pro-ject management in the process of control and application.On the basis of collecting and sorting out the relevant research results,the causes of the above problems were systematically sorted out and analyzed,and the interaction between the elements was pre-liminarily clarified.Based on this,the corresponding technical solutions were put forward,and the feasibility of the scheme was an-alyzed and discussed.The results show that:① There is a close internal relationship between river environmental ecology,river siltation,project management and other issues,which is an engineering associated problem related to tidal gate;② The simple structural function of the traditional tidal gate projects causes excessive control of the river,which is the main reason for the above-mentioned associated problems.③In order to improve the switching efficiency of gate opening and closing,it is proposed to im-plement double gate control for the traditional tidal gate projects,and intelligently upgrade the engineering software operating sys-tem,which can alleviate the above-mentioned problems associated with various projects and has certain technical feasibility.

tidal gatestructure function optimizationdouble gate control

庄文贤、赵进勇、朱丽向

展开 >

连云港市临洪水利工程管理处,江苏 连云港 222000

中国水利水电科学研究院,北京 100038

挡潮闸 结构功能优化 双闸门控制

水利部重大科技项目连云港社会发展项目

SKR-2022052SF2148

2024

人民长江
水利部长江水利委员会

人民长江

CSTPCD北大核心
影响因子:0.451
ISSN:1001-4179
年,卷(期):2024.55(7)
  • 16