基于需水过程线的多级泵站扬水灌区供需水量优化调度

扫码查看
为了改善红寺堡扬水系统供需水量在时间维度上存在的不协调问题,以需水过程线和泵站设计流量线为比较对象,构建扬水系统内泵站供需水流量优化调节模型,分析不同时段的灌溉面积、高效节水面积比重和灌溉定额等因素引起的需水流量与泵站设计流量关系.基于需水过程线多级泵站扬水灌区供需水量优化调度模型包括流量平衡模型、需水过程线模型和流量调节模型,对红寺堡扬水灌区 4 种工况进行模拟.结果表明:在高效节水面积占比为 60%时,随着灌溉面积从 6.02×104 hm2增加到 6.77×104 hm2,红三泵站控制灌域内调蓄水量从 1.47×106 m3增加到 8.49×106 m3,其他 3 座泵站调蓄规模保持不变;在高效节水面积占比为80%时,红一泵站和红三泵站不调蓄,红四泵站和红五泵站的调蓄规模分别为 3.08×106 m3和 0.47×106 m3.此模型构建与应用简单,能较好地反映出各级泵站之间、支线之间的配水关系,调节时段和调配流量选择灵活,能够适宜不同调蓄水量需求的多级泵站供水系统.
Research on Water Supply and Demand Optimization of Multi-Stage Pumping Station Based on Water Demand Process Line
In order to improve the incongruity issue(in the time dimension)of water supply and demand of Hongsibu water pumping system.Taking the water demand process line and the design flow line of pumping station as the comparison object,this paper analyzed the difference between the demand flow and the design flow of pumping station caused by factors such as the irrigation area,the proportion of efficient water-saving area and irrigation quota(fixed value)at different time periods in the pumping irrigation area,and built the optimization regulation model of water supply flow and irrigation demand flow of pumping station in the multi-stage pumping system of Hongshibu.Based on the water demand process line multi-stage pumping station water supply and demand optimization scheduling model,including flow balance model,wa-ter demand process line model and flow regulation model,the simulation analysis of four working conditions in Hongshibu irrigation area show that when the high-efficiency water-saving area accounts for 60%,as the irrigation area increases from 6.02×104 hm2 to 6.77×104 hm2,the regulated flow in the controlled irrigation area of Hongsan Pumping Station gradually increases,that is,the regulated storage capacity increa-ses from 1.47×106 m3 to 8.49×106 m3,while the regulated storage scale of the other three pumping stations basically remains unchanged.When the high-efficiency water-saving area accounts for 80%,there is basically no need for regulation and storage at Hongyi Pumping Station and Hongsan Pumping Station,while the regulated flow at Hongsi Pumping Station and Hongwu Pumping Station maintains a constant value,and the regulation and storage scales are 3.08×106 m3 and 0.47×106 m3 respectively.The water supply and demand optimization scheduling model of multi-stage pumping station based on water demand process line is simple to build and apply.The model can better reflect the water distribution relationship between the construction of multi-stage pumping station and the branch lines of pumping station,and the adjustment period and allocation flow are flexible,which can be suitable for the water supply system of multi-stage pumping station with different storage demand.

water demand linemulti-stage pumping stationsmodulation storage optimizationHongsibu pumping-irrigation area

杜军、吕岁菊

展开 >

北方民族大学 土木工程学院,宁夏 银川 750021

需水过程线 多级泵站 调节模型 红寺堡扬水灌区

宁夏自然科学基金项目宁夏自然科学基金项目北方民族大学科研启动经费北方民族大学一般项目

2020AAC032242023AAC020502019KYQD202022XYZTM05

2024

人民黄河
水利部黄河水利委员会

人民黄河

CSTPCD北大核心
影响因子:0.494
ISSN:1000-1379
年,卷(期):2024.46(2)
  • 17