首页|旭龙水电站施工总布置优化研究

旭龙水电站施工总布置优化研究

扫码查看
水电工程多位于深山峡谷,地形地质条件复杂,施工场地狭小,建设周期长,不可控因素多等.可研阶段开展了施工总布置规划,但项目实施过程中建设单位需要结合实际条件组织对施工布置方案优化调整,形成最终的施工总布置方案.笔者总结了旭龙水电站在施工总布置优化方面开展工作,可为类似工程建设提供参考借鉴.
Optimization Study of the General Construction Layout of Xulong Hydropower Station
Hydropower projects are mostly located in deep mountains and the gorges with complex terrain and geological conditions,small construction sites,long construction periods and many uncontrollable factors.Al-though the general layout was carried out in the feasibility study stage of the project,the construction unit should organize optimization and adjustment of the construction layout scheme in the implementation process according to the actual situation to form the final scheme.This study summarizes the work of general con-struction layout optimization of Xulong Hydropower Station,which can provide reference for the construction of similar projects.

General construction layoutConstruction site transportationSlag yardConstruction siteOptimiza-tion study

吴楠、喻文振、陈曦

展开 >

国家能源集团金沙江旭龙水电有限公司,四川甘孜 627950

长江勘测规划设计研究有限责任公司,湖北武汉 430010

施工总布置 场内交通 渣场 施工场地 优化研究