Study on Top-down Construction Technology of Pipe Jacking Starting Well under Bad Geological Conditions
Taking the Diversion Project from the Zhuoer River to the Xiliao River in Inner Mongolia as an exam-ple,this paper expounds the top-down construction technology of the pipe jacking starting well under bad geo-logical conditions,by means of advanced grouting,well point dewatering,monitoring,measuring,and informa-tion feedback,a series of quality and safety problems under bad geological conditions have been solved by exca-vation and support and concrete construction of top-down starting well,it effectively avoids all kinds of risks in the construction of traditional shaft foundation pit,sums up the construction technology and key procedures of top-down construction method under bad geological conditions and control points,and the experience obtained can provide reference for similar projects in the future.
Diversion Project from the Zhuoer River to the Xiliao River in Inner MongoliaBad geologyStarting wellTop-down construction methodConstruction technology