Treatment for Dangerous Rock Mass of High Slope of Lijiayan Reservoir
Due to the complex topography of high slope and large elevation difference,the mechanical utilization rate is low,the manual labor intensity is high and the risk factor is high in the treatment process of dangerous rock mass.In order to properly deal with the problem of dangerous rock mass,it is necessary to choose the ap-propriate slope treatment measures and construction schemes to reduce the construction risk,improve the con-struction efficiency and control the project cost.Taking the dangerous rock mass control of Xujiacou material yard of Lijiayan Reservoir project as an example,the paper expounds the control measures and construction scheme in detail,which has certain reference significance for the dangerous rock mass control of high slope.
Lijiayan ReservoirHigh slopeTreatment of dangerous rock massMonitoring