小洞径水工隧洞施工中错车洞的应用

扫码查看
水利水电工程中的小洞径隧洞的施工组织一直以来都是施工中的难点,同时亦为项目经营管控的重点.然而,利用有限的施工资源,合理地进行现场组织能够减小隧洞开挖、支护、衬砌、灌浆等每道工序的施工时间,进而大大提高施工资源的利用率,缩短了施工工期.阐述了李家岩水库工程城乡供水隧洞施工过程中,通过在洞内设置错车洞并在隧洞施工全过程中充分利用,解决了小洞径隧洞内无法错车的问题,使施工效率得到了有效提高,所取得的经验对类似小洞径隧洞施工具有一定的参考价值.
Application of Staggered Tunnel in the Construction of Small Diameter Hydraulic Tunnels
The construction organization of small-diameter tunnels in water conservancy and hydropower pro-jects has always been a difficult point in the construction process,and it is also a focus of project management and control.By utilizing limited construction resources for reasonable on-site organization and reducing the construction time of each process cycle such as tunnel excavation,support,lining,and grouting through organi-zational means,the utilization rate of construction resources can be greatly improved and the construction peri-od can be shortened.In the construction process of the urban and rural water supply tunnel in the Lijiayan Reservoir project,a staggered tunnel was set up inside the tunnel,and it was fully utilized throughout the tun-nel construction process,solving the problem of the inability to staggered in small diameter tunnels.At the same time,the construction efficiency was effectively improved,which has certain reference significance for the construction of similar small diameter tunnels.

Small tunnel diameterHydraulic tunnelStaggered tunnelsConstruction efficiencyLijiayan Reser-voir Project

杨发宝、刘英

展开 >

中国水利水电第七工程局有限公司,四川 成都 610213

小洞径 水工隧洞 错车洞 施工效率 李家岩水库工程

2024

四川水力发电
四川省水力发电工程学会

四川水力发电

影响因子:0.211
ISSN:1001-2184
年,卷(期):2024.43(5)