以硬梁包水电站为依托,阐述了在含漂砂卵砾石粗粒土层下通过采用框格式防冲地连墙施工关键技术和膨润土泥浆的运用达到了良好的固壁效果,圆满地解决了针对含漂砂卵砾石粗粒土层下的绕渗、塌孔、漏浆等问题,保证了施工进度,达到了防渗要求,为类似地质条件下的护坦末端框格式地连墙施工积累了经验.
Key Technology for the Construction of the Anti-scouring Connecting Ground Wall at the End of Flood Protection of the Yingliangbao Hydropower Project
This paper,based on the Yingliangbao Hydropower Project,summarizes the key technology of anti-scouring ground wall construction and the application of bentonite mud under the coarse soil layer containing bleach sand and gravel,as a way to achieve good wall consolidation effect,solve the problems of seepage a-round,hole collapse and slurry leakage under the coarse soil layer containing bleach sand and gravel,ensure the construction progress and meet the requirements of anti-seepage.The experience is accumulated for the con-struction of ground connecting wall with apron end frame format under similar geological conditions,which can be used as reference for similar projects.

Yingliangbao Hydropower ProjectAnti-scouring connecting ground wall at the end of flood protec-tionFrame format anti-scouring connecting ground wall

王石连、夏维学、林晓旭

展开 >

中国水利水电第七工程局有限公司,四川 成都 610213

硬梁包水电站 护坦末端防冲地连墙 框格式防冲地连墙

2024

四川水力发电
四川省水力发电工程学会

四川水力发电

影响因子:0.211
ISSN:1001-2184
年,卷(期):2024.43(6)