上海轨道交通11号线南段地铁隧道中隔墙施工技术
Technologies for Assembly of Separation Wall of a Metro Tunnel on South Section of No.11 Line of Shanghai Rail Transit Works
周均立1
作者信息
- 1. 上海城建市政工程 集团 有限公司,上海 200065
- 折叠
摘要
上海轨道交通11号线南段工程在国内首次采用11.58 m 泥水平衡盾构施工,并运用钢筋混凝土墙板结构分隔单圆空间,形成单管双线地铁隧道。结合施工进度要求和现场环境条件,首创特制机械拼装预制中隔墙技术,可大幅度提高施工效率和工程质量。文章就中隔墙施工关键技术(如预制件吊装施工技术、预制中隔墙安装临时支撑技术、预制件顶部传力杆安装技术)进行阐述。
Abstract
The south section of No.11 Line of Shanghai rail transit works is a single-tube double-track tunnel bored by11.58 m slurry shield.Prefabricated concrete separation wall is assembled within the Metro tunnel.To this end,a separation wall assembling machine is developed on basis of the construction schedule and the working environment,so as to improve the assembly efficiency and the assembly quality.In the paper,the key technologies for the assembly of the separation wall,including the prefabricated component hoisting and assembling technology,the temporary supporting technology and the dowel steel installation technology,are presented.
关键词
上海轨道交通/11/号线/单管双线隧道/地铁隧道/中隔墙/预制件/吊装Key words
No.11 Line of Shanghai Rail Transit Work/single-tube tunnel containing double tracks/Metro tunnel/separation wall/prefabricated component/hoisting引用本文复制引用