首页|香炉山隧洞不良地质段"L"型地面超前注浆方案研究

香炉山隧洞不良地质段"L"型地面超前注浆方案研究

L-Shaped Ground Advance Grouting Scheme in Bad Geological Section of Xianglushan Tunnel

扫码查看
为解决隧道(洞)建设过程中不良地质段突泥涌水和软岩大变形等问题,依托滇中引水工程香炉山隧洞,提出一种采用全孔长度超过 500 m的地面"L"型定向钻孔注浆并辅以洞内超前注浆的加固方法,在实际工程中确定这一方法的具体设计方案.首先,通过现场地质调查与分析,揭示不良地质区段香炉山隧洞建设的技术难点;其次,介绍"L"型定向钻孔注浆的施工过程及注浆工艺;然后,设计出一种能够提高地层稳定性的"L"型地面超前注浆方案,并对地层进行加固;最后,采用掌子面揭示、注浆技术以及大地电磁检测等手段证明现场注浆效果.研究结果表明:1)"Z1+Z2+Z4"钻场设计为最优地面超前注浆技术方案;2)"L"型定向钻孔注浆辅以洞内超前注浆技术可满足盲区注浆区域覆盖问题,实现真正意义上的超前治理.
Large mud and water gushing and soft rock deformation often occur in-tunnel sections with poor geology.Therefore,an L-shaped ground directional drilling and grouting with an entire hole length of over 500 m assisted by in-tunnel advance grouting is proposed for the construction of the Xianglushan tunnel of the Central Yunnan water-conveyance project.The specific design scheme of the proposed method is determined.First,the on-site geological survey results reveal the technical difficulties of the unfavorable geological sections of the Xianglushan tunnel.The construction process and grouting technology of the L-shaped directional drilling grouting are explained.Second,a ground reinforcement scheme for L-shaped ground advance grouting is designed to improve the stratum stability.Finally,the on-site grouting effect is illustrated by tunnel face revelation,grouting results,and magnetotelluric analysis.The results show that the Z1+Z2+Z4 drilling field design is the optimal ground advance grouting scheme,and the L-shaped directional drilling grouting assisted with advance in-tunnel grouting technology can cover the grouting area in the blind area,realizing advance reinforcement.

deep-buried tunnelwater-conveyance tunnelbad geology sectionmud and water gushingsoft rock large deformationL-shaped ground directional drilling and grouting

赵利鹏、李坚、雷啸天、郭亚欣、王廷超、陶志刚

展开 >

中国葛洲坝集团三峡建设工程有限公司,湖北 宜昌 443000

云南省滇中引水工程有限公司,云南 昆明 650000

中国矿业大学(北京) 隧道工程灾变防控与智能建养全国重点实验室,北京 100083

中国矿业大学(北京)力学与建筑工程学院,北京 100083

展开 >

深埋隧洞 输水隧洞 不良地质段 突泥涌水 软岩大变形 地面"L"型定向钻孔注浆

云南省重大科技专项计划项目

202002AF080003

2024

隧道建设(中英文)
中铁隧道集团有限公司洛阳科学技术研究所

隧道建设(中英文)

CSTPCD北大核心
影响因子:0.785
ISSN:2096-4498
年,卷(期):2024.44(6)