为解决滇藏铁路丽香线哈巴雪山隧道施工过程中产生的大变形问题,采用数值模拟、现场监测的方法,对哈巴雪山隧道不同平行导洞超前距离下隧道变形及正洞区域应力进行研究,提出平行导洞的合理超前距离.研究结果表明:1)哈巴雪山隧道平行导洞超前正洞的距离应设定为 100 m,此时平行导洞对正洞区域的应力释放效果已达 90%以上.2)平行导洞的设置使正洞拱顶沉降减小 6.92%,上台阶水平收敛减小 14.58%,下台阶水平收敛减小 10.8%.由此可知,平导超前开挖能够减小正洞支护变形,对正洞水平收敛的控制效果大于拱顶沉降.
Reasonable Advance Distance of Parallel Guiding Tunnels in Super-Deep Soft Rock Tunnels
To address the large deformation encountered during the construction of the Haba Snow Mountain tunnel on the Lijiang-Shangri-La section of the Yunnan-Xizang railway,the authors employ numerical simulations and on-site monitoring methods to examine the deformation of the tunnel and the stress in the main tunnel area under different advance distances of parallel guiding tunnels.A reasonable advance distance for the parallel guiding tunnels is proposed.The research results indicate the following:(1)The advance distance of the parallel guiding tunnel should be 100 m ahead of the main tunnel,which can achieve a stress release effect of over 90%on main tunnel area by parallel guiding tunnel.(2)On-site monitoring results show that the parallel guiding tunnel reduces the settlement of the main tunnel crown by 6.92%,the horizontal convergence of the upper bench by 14.58%,and the horizontal convergence of the lower bench by 10.8%.Thus,it is evident that the advance excavation of the parallel guiding tunnel can reduce the deformation of the main tunnel support.The control effect on the horizontal convergence of the main tunnel is greater than that on the crown settlement.

super-deep depthsoft rock tunnelstress release technologyparallel guiding tunneladvance distance

谭忠盛、张宝瑾、马建华、陈应武、赵金鹏、范晓敏、王雪冰

展开 >

北京交通大学 城市地下工程教育部重点实验室,北京 100044

中国铁路昆明局集团有限公司滇西铁路建设指挥部,云南 大理 671000

超大埋深 软岩隧道 应力释放技术 平行导洞 超前距离

国家自然科学基金(面上)

51978041

2024

隧道建设(中英文)
中铁隧道集团有限公司洛阳科学技术研究所

隧道建设(中英文)

CSTPCD北大核心
影响因子:0.785
ISSN:2096-4498
年,卷(期):2024.44(z1)