某隧道运营期间因结构病害拆除原风机后需补充安装一组新风机,对原风机位置衬砌病害进行了调查和原因分析,结合各衬砌结构病害情况对补充安装风机的位置进行了比选,通过粘贴钢板加固衬砌结合锚杆悬挂预埋件的方式解决了新位置安装风机的需求,通过相关验算验证了方案的可行性.
A study on new added jet fan in serious disease tunnel
In view of the situation that the original fan needs to be installed after removing the original fan due to structural disease during the operation of a tunnel,the lining disease of the original fan position was investigated,the cause of the disease was analyzed,the location of the supplementary installation fan was selected based on the disease of the lining structure,and the demand for installing the fan in the new position was solved by pasting the steel plate reinforced lining combined with the bolt suspension embedded parts,and the feasibility of the scheme was verified by relevant verification.