Optimizing the coded circuit for the green-yellow-drop white light phenomenon in railway signaling systems
Due to the influence of on-site factors,the distance of departure routes has changed,and the existing 4G coding circuit may cause the phenomenon of green,yellow,and white lights on locomotive signals.In this project,the single end coding of the station track will be changed to double end coding.Through circuit analysis and analysis of the reasons for code dropping,a feasible solution will be determined based on the premise of ensuring train safety,minimizing construction difficulty,and shortening construction period.The problems caused by the previous station yard renovation project will be solved together.