The scheduling and allocation problems of human resources in water conservancy program are studied to improve the robustness of the program and ensure the minimum compensation cost of the project.From the perspective of owners,a robust scheduling model of water conservancy program group is constructed based on the robust index of net present value construction period delay compensation cost.The model uses the minimize schedule delay compensation cost(MSDCC)algorithm to allocate human resources for water conservancy program with fixed duration.In the case of delay of a certain contract project of the program,the optimal allocation will be carried out after the owner takes measures to ensure that the total construction period remains unchanged.The results show that the proposed model can obtain a scheduling scheme with high robustness,achieve the goal of minimum compensation cost,and effectively control the adjusted compensation cost and delay risk.
关键词
人力资源/资源流网络/鲁棒性/水利项目/项目群调度
Key words
human resources/resource flow network/robustness/water conservancy program/program group scheduling