水利水电快报2025,Vol.46Issue(1) :116-120.DOI:10.15974/j.cnki.slsdkb.2025.01.020

基于AHP-TOPSIS的中小型抽水蓄能站点征地移民安置优选评价

Optimal evaluation of land expropriation and resettlement of small and medium-sized pumped storage power stations based on AHP-TOPSIS

李宇星
水利水电快报2025,Vol.46Issue(1) :116-120.DOI:10.15974/j.cnki.slsdkb.2025.01.020

基于AHP-TOPSIS的中小型抽水蓄能站点征地移民安置优选评价

Optimal evaluation of land expropriation and resettlement of small and medium-sized pumped storage power stations based on AHP-TOPSIS

李宇星1
扫码查看

作者信息

  • 1. 广东省水利电力勘测设计研究院有限公司,广东 广州 510635
  • 折叠

摘要

为从征地移民安置的角度对中小型抽水蓄能站点进行优选,以广东省内7个中小型抽水蓄能站点为样本,采用AHP-TOPSIS模型对其征地移民安置条件进行优选评价.结果表明:7个站点从优到劣排序的结果为大安站点>周田站点>太平站点>连麦站点>荃坑站点>英利站点>明湖站点,制约性因素如移民指标、基本农田指标、生态红线指标等为中小型抽水蓄能电站征地移民安置的首要影响因素.研究可为中小型抽水蓄能选点工作提供一定的借鉴参考.

Abstract

In order to select a suitable methods to optimize small and medium-sized pumped storage power station sites from the perspective of land acquisition and resettlement,7 small and medium-sized pumped storage power station sites in Guangdong Province were taken as samples,and the AHP-TOPSIS model was used to optimize and evaluate the re-settlement conditions of their land expropriation.The results showed that the ranking results of 7 sites from best to worst were Da'an site>Zhoutian Site>Taiping site>Lianmai site>Quankeng site>Yingli Site>Minghu site.The constraint factors,such as immigration,basic farmland,ecological red line,etc.,were the primary factors affecting the land acquisi-tion and resettlement of small and medium-sized pumped storage power stations.This study can provide a reference for the selection of small and medium-sized pumped storage.

关键词

中小型抽水蓄能电站/移民安置评价/AHP-TOPSIS模型/理想解法/优选评价

Key words

small and medium-sized pumped storage power station/resettlement evaluation/AHP-TOPSIS model/i-deal solution/optimization evaluation