Optimal evaluation of land expropriation and resettlement of small and medium-sized pumped storage power stations based on AHP-TOPSIS
In order to select a suitable methods to optimize small and medium-sized pumped storage power station sites from the perspective of land acquisition and resettlement,7 small and medium-sized pumped storage power station sites in Guangdong Province were taken as samples,and the AHP-TOPSIS model was used to optimize and evaluate the re-settlement conditions of their land expropriation.The results showed that the ranking results of 7 sites from best to worst were Da'an site>Zhoutian Site>Taiping site>Lianmai site>Quankeng site>Yingli Site>Minghu site.The constraint factors,such as immigration,basic farmland,ecological red line,etc.,were the primary factors affecting the land acquisi-tion and resettlement of small and medium-sized pumped storage power stations.This study can provide a reference for the selection of small and medium-sized pumped storage.
small and medium-sized pumped storage power stationresettlement evaluationAHP-TOPSIS modeli-deal solutionoptimization evaluation