水利水运工程学报2024,Issue(5) :95-102.DOI:10.12170/20240321004

高桩码头桩群对水动力参数影响的数值模拟

Numerical simulation of the impact of pile groups of high-pile wharves on hydrodynamic parameters

薛玉娆 张金凤 张庆河 尤再进 季则舟
水利水运工程学报2024,Issue(5) :95-102.DOI:10.12170/20240321004

高桩码头桩群对水动力参数影响的数值模拟

Numerical simulation of the impact of pile groups of high-pile wharves on hydrodynamic parameters

薛玉娆 1张金凤 2张庆河 1尤再进 3季则舟4
扫码查看

作者信息

  • 1. 天津大学 水利工程智能建设与运维全国重点实验室,天津 300350
  • 2. 天津大学 水利工程智能建设与运维全国重点实验室,天津 300350;天津大学 地震工程模拟与抗震恢复中国地震局重点实验室,天津 300350
  • 3. 大连海事大学 交通运输工程学院,辽宁 大连 116026
  • 4. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 折叠

摘要

桩基码头是常用的码头结构形式,应用广泛.高桩码头桩群基础改变了周围水动力场,引起泥沙冲淤规律的变化,从而对码头结构稳定性产生影响,研究圆柱桩群阻力特性,对水流和底床冲淤变化研究具有重要意义.基于FVCOM的三维水动力模型,将桩柱绕流阻力等效为水流阻力,提出一种桩群阻水效果的概化方法,通过增加桩群阻力项来研究桩群对水动力环境参数的影响,构建了群桩下方和后方水动力规律的三维水动力改进模型.该模型应用于舟山某高桩码头附近流场的模拟计算,结果与实测值吻合良好,证明了模型的有效性;计算结果表明,桩群影响使得码头后方的流速减小,比码头前方减小约 67%.所构建的模型可进一步研究高桩码头下方和后方冲淤演变规律,为码头建设和运维提供技术支撑.

Abstract

Pile foundation wharves are commonly used dock structures with widespread applications.The foundations of high-pile wharves,consisting of groups of piles,alter the surrounding hydrodynamic field,causing changes in the sedimentation and erosion patterns,thereby affecting the stability of the dock structures.The study of cylindrical pile group resistance characteristics is of significant importance for the research on water flow and bed-load sediment transport changes.Based on the three-dimensional hydrodynamic model of FVCOM,this study equates pile flow resistance to water flow resistance and proposes a generalized method for the water-blocking effect of pile groups.By adding a pile group resistance term,the study investigates the impact of pile groups on hydrodynamic environmental parameters and constructs a three-dimensional hydrodynamic improvement model for water dynamics below and behind the pile groups.This model was applied to simulate the flow field near a high-pile wharf in Zhoushan,and the results closely matched measured values,proving the model's effectiveness.The findings indicate that the pile group effect results in a decrease in the flow velocity behind the wharf by approximately 67%compared to the front.The constructed model can further investigate the evolution of sediment transportation patterns below and behind the high-pile wharf,providing technical support for wharf construction and operation.

关键词

水流阻力/桩群概化/FVCOM三维模型/水动力/高桩码头

Key words

water flow resistance/pile group generalization/FVCOM three-dimensional model/hydrodynamics/high-pile wharf