以某新建隧道下穿既有快速路为项目背景,通过有限元数值模拟手段对比分析了 CD法和双侧壁导坑法开挖隧道时对既有公路的影响,分析结果表明CD法和双侧壁导坑法开挖造成的路面最大沉降值依次为1.73 cm和1.43 cm,双侧壁导坑法施工过程中的路面沉降及沉降增量均小于CD法.双侧壁导坑法的塑性区分布范围比CD法更大,但均满足隧道开挖时的稳定性要求.

Abstract

Focusing on a new underpass tunnel of the existing expressway,this paper used the finite element numerical simulation means to compare and analyze the influences of the excavation by the CD method and the twin-side heading method on the existing expressway.The analysis results showed that the maximum settlement values of the road surface caused by the excavation of the CD method and the twin-side heading method were 1.73 cm and 1.43 cm,respectively.Using the twin-side heading method caused a smaller settlement and settlement increment than the CD method during the construction process.The distribution range of the plastic zone of the twin-side heading method was larger than that of the CD method,but they all met the stability requirements of tunnel excavation.

关键词

隧道/CD法/双侧壁导坑法/沉降/塑性应变

Key words

tunnel/CD method/twin-side heading method/settlement/plastic strain