新建道路与既有道路相交叉,涉路保通问题和施工方案有直接的关系.常见的施工方法是封闭既有道路或修筑保通辅道,封闭既有道路,影响道路的通行,修筑保通辅道会增加额外的修建和拆除工程量,造成极大的浪费和环境污染.而且,往往受土地限制和周边建筑的影响,很多时候修建保通辅道很难实现.结合实际工程探讨采用不阻断既有道路通行的施工方案,解决了传统的施工方法的诸多问题.
Design and Construction Schemes of Ensuring Traffic for Structures and Utilities within Right-of-way of Highways
When the newly built roads cross the existing roads,how to ensure the traffic for structures and utilities within the right-of-way of highways is directly related to the construction schemes.The commonly used construction schemes are to close existing roads and build ensuring-traffic auxiliary lanes.However closing existing roads would affect the traffic,while building auxiliary lanes would add additional construction and demolition works,resulting in considerable waste and environmental pollution.Besides,affected by the land constraints and surrounding buildings,it is difficult to build an ensuring-traffic auxiliary lane.In this paper,based on an engineering practice,a construction scheme that does not block access to existing roads is discussed,which can solve various problems of conventional construction methods.

open-to-traffic statusunder-crossingexisting roadensuring traffic

王静

展开 >

山西省交通规划勘察设计院有限公司,山西 太原 030032

通车状态 下穿 既有道路 施工保通

2024

山西交通科技
山西交通科技信息中心站

山西交通科技

影响因子:0.381
ISSN:1006-3528
年,卷(期):2024.(4)