Based on the investigation and evaluation of the soil salinization level before the construction of the project,this study takes the Hutuo River and Yangwu River as the study area,in accordance with the guidelines for Soil Environmental Impact Assessment,the impact of emergency water transfer period on soil salinization on both banks of the river was quantitatively predicted using a comprehensive soil salinization scoring method to provide a basis for the sustainable use of the project
Hutuo River connecting projectSoil salinizationComprehensive soil salinization scoring method