Taking the third phase reconstruction and expansion project of Taiyuan Airport as an example,according to the design documents and the field investigation,the disturbance of the ground surface and the destruction of the vegetation during the construction period were determined,and according to the guidelines for measuring the amount of soil loss in production and construction projects,the soil loss types,calculation units and prediction time were divided reasonably,and the corresponding prediction formula was adopted to calculate the soil loss amount of each calculation unit,and the total soil loss amount of the project area was added and counted.
关键词
土壤流失量测算/土壤流失类型/计算单元/太原机场三期工程
Key words
Measure and estimation of soil erosion/Type of soil erosion/Calculation unit/Taiyuan Airport Phase Ⅲ Project