根据深圳LNG应急调峰站取水口平面布置,结合其使用功能特点和施工过程,取水口结构采用与护岸同步施工.针对取水口结构尺寸大、质量过大、浮运安装比较困难的问题,进行针对性的结构设计,采取"预制浮坞式+现场二次浇筑"方案,并对不同工况下结构内力进行数值分析.结果表明,该方案能满足设计要求,较好地克服施工过程中遇到的困难,并顺利通过交工验收,达到了节约成本和缩短工期的目的.
Design of water intake for Shenzhen LNG emergency peak shaving station
Based on the layout of the water intake for the Shenzhen LNG emergency peak shaving station,combined with its functional characteristics and construction process,the water intake structure is constructed synchronously with the revetment.In view of challenges of the large size,excessive mass,and difficulty in installation due to floating transportation of the water intake structure,a targeted structural design approach is carried out.The"prefabricated floating dock+on-site secondary pouring"scheme is adopted,and numerical analysis of internal forces under different conditions is carried out.The results show that this scheme meets the design requirements.It effectively overcomes challenges encountered during the construction process and successfully passes the final inspection,achieving the goals of cost savings and shortened construction period.

water intakelarge componentfloating installationnumerical analysis

谢乔木、卢少彦、杨旭

展开 >

中交第四航务工程勘察设计院有限公司,广东 广州 510290

取水口 大型构件 浮运安装 数值分析

2024

水运工程
中交水运规划设计院有限公司

水运工程

CSTPCD
影响因子:0.428
ISSN:1002-4972
年,卷(期):2024.(8)
  • 4