首页|岩溶地区某码头工程的勘察与桩基设计优化策略

岩溶地区某码头工程的勘察与桩基设计优化策略

扫码查看
结合韶关岩溶地区某码头工程,对其桩基设计与溶洞处理问题进行深入研究.目标是在复杂地质条件下提高桩基设计的可靠性和安全性.通过结合钻探和多种地球物理探测方法(包括管波探测法和弹性波CT法),对岩溶区的地质特征进行全面勘察,并提出在溶洞物理力学性质较弱的区域实施"先逐层冲填片石后注浆"的处理方案.结果表明,溶洞分布不规则,大小和深度变化大;静载试验结果验证了处理方案的有效性.
Survey and optimization strategy of pile foundation design for wharf project in Karst area
Based on a wharf project in Shaoguan within Karst regions,we study the problem of pile foundation design and Karst caves treatment in wharf project to achieve the aim of improving the reliability and safety of pile foundation design under complex geological conditions.By combining drilling and various geophysical detection methods(including tube wave detection and elastic wave CT methods),we carry out a comprehensive survey of geological characteristics of Karst area,and propose a treatment approach involving"layered stone filling followed by grouting"for areas with weaker physical and mechanical properties of Karst caves.The results show that the distribution of Karst caves is irregular with varying greatly in size and depth.Static load test results are validated the effectiveness of this treatment approach.

Karstsurveyoptimization of pile foundation design

陈振道、杨克勤、黄雯雯

展开 >

中交第四航务工程勘察设计院有限公司,广东 广州 510290

广东省土地调查规划院,广东 广州 510075

溶洞 勘察 桩基设计优化

2024

水运工程
中交水运规划设计院有限公司

水运工程

CSTPCD
影响因子:0.428
ISSN:1002-4972
年,卷(期):2024.(8)
  • 9