首页|超大直径盾构隧道穿越既有老旧建筑群的影响分析与监测

超大直径盾构隧道穿越既有老旧建筑群的影响分析与监测

扫码查看
以深圳市春风隧道穿越既有大滩大厦与海关员工宿舍楼2、3栋建筑群为背景,采用数值分析与现场监测相结合的方法,对盾构隧道施工过程中既有建筑群的变形进行了分析,探讨了其主要影响区的范围和沉降变形量.研究结果表明,数值分析能够较好地反映盾构隧道施工对邻近建筑群的影响;现场监测结果显示,在袖阀管注浆地层加固后盾构掘进对建筑物沉降(隆起)的影响范围为建筑物前后各40 m左右,既有建筑群在盾构掘进过程中沉降(隆起)最大值均满足控制值的要求;袖阀管预注浆加固对桩体位移和既有建筑群沉降具有明显的控制作用.
Analysis & Monitoring of Large Diameter Shield Tunnel Through Existing Old Buildings
Based on Chunfeng Tunnel through existing Datan Building and No.2 and No.3 Customs staff dormitory buildings in Shenzhen,the deformation of these old buildings were analyzed during shield tunnel construction pro-cess by combining numerical analysis with on-site monitoring.The main impact area scope and settlement deforma-tion volume were discussed.The research results show that the numerical analysis can better reflect the impact;The field monitoring results show that the impact area of shield tunneling on the settlement(uplift)of buildings is about 40 m before and behind the buildings after the reinforcement of the sleeve raft pipe grouting stratum.The maximum settlement(uplift)value meets the requirements of the control value.That sleeve valve pipe pre-grouting reinforce-ment has obvious control effect on pile displacement and building group settlement.

shield tunnelingnumerical simulationon site monitoringgrouting reinforcementpile foundation

梁志超、王言然、刘明高、周长林

展开 >

北京市市政工程设计研究总院有限公司,北京 100082

盾构掘进 数值模拟 现场监测 注浆加固 桩基

2024

市政技术
中国市政工程协会 北京市政路桥股份有限公司 北京市政建设集团有限责任公司 北京市市政工程研究院

市政技术

影响因子:0.385
ISSN:1009-7767
年,卷(期):2024.42(1)
  • 8