为分析小半径曲线变坡度连续钢箱梁顶推与高位落梁施工过程中各杆件力学行为的变化,以四川省长宁县龙头枢纽互通E匝道第2联(36+56+41)m连续钢箱梁上跨高速公路施工为例,采用有限元方法,分别对顶推支架、落梁支架、桥墩(含盖梁)的受力状态进行了数值仿真计算,将理论值与现场实测值进行了对比分析.研究结果表明,支架与桥墩应力实测值与理论值误差较小,各工况的有限元受力分析较合理;桥墩结构应力实测值与理论值偏差在±20%范围,钢结构应力实测值与理论值偏差在±10%范围.各工况下,施工监测数据采集有效,结构不会发生失稳破坏.
Simulation Analysis of Pushing and High Girder Falling Construction for Continuous Steel Box Girders With Small Radius Curve and Variable Slope
In order to analyze the change of mechanical behaviors of every member of continuous steel box girder with small radius curve and variable gradient during pushing and high position falling,the construction of the second(36+56+41)m continuous steel box girders of the E-ramp of tap interchange in Changning County,Sichuan Province was taken as an example.The finite element method was used to numerical simulation calculate the construction of the pushing support and the falling support,the stress state of the pier(including the cap beam)respectively.And the theoretical value was compared with the field measured value.The results show that the error between the measured and theoretical value of the stress of the support and the pier is smaller,and the finite element stress analysis is rea-sonable under each working condition;The deviation between the measured value and the theoretical value of the steel structure stress is within the range of±10%.Under each working condition,collection of the construction mon-itoring data is effective,and the structure isn't unstable failure.

small radius curvevariable slopesteel box girderpushinghigh girder fallingforce analysisstress monitoring

吴俊、牛子民

展开 >

中铁北京工程局集团有限公司,北京 102308

小半径曲线 变坡度 钢箱梁 顶推 高位落梁 受力分析 应力监测

2024

市政技术
中国市政工程协会 北京市政路桥股份有限公司 北京市政建设集团有限责任公司 北京市市政工程研究院

市政技术

影响因子:0.385