铁道机车车辆2024,Vol.44Issue(1) :136-141.DOI:10.3969/j.issn.1008-7842.2024.01.20

动车组牵引系统接地故障分析及优化研究

Grounding Fault Analysis and Troubleshotting for EMU Traction System

刘克思 贾焕军 王安 周立辉
铁道机车车辆2024,Vol.44Issue(1) :136-141.DOI:10.3969/j.issn.1008-7842.2024.01.20

动车组牵引系统接地故障分析及优化研究

Grounding Fault Analysis and Troubleshotting for EMU Traction System

刘克思 1贾焕军 2王安 1周立辉2
扫码查看

作者信息

  • 1. 中国铁路济南局集团有限公司 青岛动车段,山东青岛 266011
  • 2. 中车唐山机车车辆有限公司,河北唐山 063035
  • 折叠

摘要

动车组牵引系统接地故障为动车组主供电系统最为典型的故障之一,且对动车组安全运营影响较大,文中通过对某型动车组牵引系统接地故障进行分析,查找各方面因素,并从相关部件的设计结构、工艺方案及故障诊断逻辑等方面研究优化措施,降低并预防接地故障的发生.

Abstract

Ground fault of EMU traction system is one of the most typical faults of EMU main power supply system,and has a great impact on the safety operation of EMU.This paper analyzes the ground fault of a certain type of EMU traction system,finds out various factors,and studies optimization measures from the aspects of design structure,process scheme and fault diagnosis logic of related components.Reduce and prevent ground faults.

关键词

动车组/牵引系统/故障/优化

Key words

electric multiple units(EMU)/traction system/malfunction/optimize

引用本文复制引用

出版年

2024
铁道机车车辆
中国铁道科学研究院 中国铁道学会牵引动力委员会

铁道机车车辆

北大核心
影响因子:0.254
ISSN:1008-7842
参考文献量5
段落导航相关论文