我国的铁路网规模在不断扩大,已经由主干网的建设逐步向联网、补网、强链方向发展,艰险山区铁路的建设不断拓展,跨越大江大河的项目持续涌现.南利河横亘于滇桂交界,在六诏山西侧深切大地,形成天堑鸿沟,国家中长期铁路网规划项目沿边铁路在此区域既要穿越六诏山,又要跨越南利河,从穿山角度看线位越高越好,既缩短隧道长度又规避地质风险,可以更好地适应岩溶条件下的工程建设,从跨河角度看线位越低越好,既降低桥梁高度又方便施工,是工程建设及运营者希望的技术方案.如何选择合适的桥位,既利跨河又益穿山,是项目建设的重难点,需要从地质条件、经济条件、施工条件等多方面论证,同时桥位的选择还应结合桥梁结构形式的选择进行分析,本文先从区域宏观角度进行分析,然后对选定的桥位进行孔跨样式的比选,最终确定南利河桥的建设方案.
Study on the Location Selection and Bridge Types of the Railways Along the Border Crossing Nanli River
The scale of China's railway network is constantly expanding,and it has gradually shifted from the construction of the main railway network to the direction of network completion,network strengthening,and network optimization.The construction of railways in difficult mountainous areas is constantly underway,and there are more and more projects crossing large rivers.The Nanli River is located at the junction of Yunnan and Guangxi,and is deeply cut into the land on the west side of the Liuzhao Mountains,forming a natural traffic barrier.The national medium and long-term railway network planning project for the railways along the border in this area requires crossing both Liuzhao Mountains and the Nanli River.From the perspective of mountain crossing,the higher the line elevation,the better.It not only shortens the length of the tunnel but also avoids geological risks,which can better adapt to engineering construction under karst conditions,From the perspective of crossing rivers,the lower the elevation of the line,the better.It not only reduces the height of the bridge but also facilitates construction,which is a technical solution that engineering construction and operation personnel hope to adopt.How to choose a suitable bridge location,which is beneficial for both crossing the Nanli River and crossing the Liuzhao Mountains,is the key and difficult point of project construction.It needs to be demonstrated and compared from various aspects such as geological conditions,economic conditions,and construction conditions.At the same time,the selection of bridge location should also be analyzed in conjunction with the structural form of the bridge.This article first analyzes from a regional macro perspective,and then compares and selects the span style of the selected bridge location,and finalizes the construction plan for the Nanli River Bridge.

railways along the borderbridge location selectionhole span comparison and selection

李志鹏

展开 >

中铁第五勘察设计院集团有限公司 北京 102600

沿边铁路 桥位选址 孔跨比选

中铁第五勘察设计院集团有限公司科研计划

T5Y2022-C02

2024

铁道建筑技术
中国铁道建筑总公司

铁道建筑技术

影响因子:0.539
ISSN:1009-4539
年,卷(期):2024.(1)