Ventilation and Air Conditioning Technical Scheme of Rail Transit with Station Skipping Operation
The operation of rail transit going by the station without stopping involves the influence of multiple specialties.Referring to the design scheme of the project of Hefei Metro Line 3,this paper analyzed the ventilation scheme of the long-section tunnel caused by the operation without station stopping and the temporary transition scheme of ventilating air conditioning for the missed station.In addition,the paper studied different professional interfaces involved in the operation without station stopping and the connection of normal operation in the future.By analyzing the influence of the operation without station stopping on different operating conditions of the train,the paper discussed the main principles,the scheme for the operation without station stopping,the permanent scheme,and the related operation management of the important ventilating air conditioning and proposed ventilating air conditioning solution for the operation without station stopping,which could provide a reference for other similar rail transit projects.
rail transitstation skippingventilation and air conditioning