挤压性围岩隧道大变形机理及控制技术

扫码查看
软岩大变形一直是隧道施工中一个难题,处理不当将会严重影响隧道的安全、工期、质量和成本,挤压性围岩大变形由于国内外案例少,缺乏相关经验,进一步增加了施工难度.本文以玉磨铁路甘庄隧道为依托,通过分析地应力、地质构造、地层岩性确定了大变形发生的机理;根据大变形发生机理确定了相应的控制技术,包括三台阶变种短台阶开挖技术、压钢拱架变形控制技术、破碎带高速超前注浆技术、让压填充层变形控制技术等,通过一系列针对性的措施,成功控制住了围岩变形,并且提高了施工效率,可为类似的工程提供参考.
Large Deformation Mechanism and Control Technology of Squeezing Surrounding Rock Tunnel
Large deformation of soft rock is always a difficult problem in tunnel construction.Improper handling will seriously affect the safety,construction period,quality and cost of the tunnel.Due to the lack of cases at home and abroad,and the lack of relevant experience,the large deformation of squeezing surrounding rock further increases the construction difficulty.This paper is based on Ganzhuang Tunnel of Yumo Railway.The mechanism of large deformation is determined by analyzing in-situ stress,geological structure and formation lithology.According to the mechanism of large deformation,the corresponding control technology is determined,including three-step variant short-step excavation technology,deformation control technology of pressed steel arch,high-speed advanced grouting technology of broken zone,deformation control technology of yielding filling layer,etc.Through a series of targeted measures,the deformation of surrounding rock is successfully controlled,and the construction efficiency is improved.It can provide reference for similar projects.

squeezing surrounding rocktunnellarge deformation mechanismcontrol technology

张建峰

展开 >

中铁十七局集团有限公司 山西太原 030006

挤压性围岩 隧道 大变形机理 控制技术

中铁十七局集团有限公司科技研发计划项目

2016-94

2024

铁道建筑技术
中国铁道建筑总公司

铁道建筑技术

影响因子:0.539
ISSN:1009-4539
年,卷(期):2024.(3)
  • 12