软黏土地层地铁盾构始发端加固及掘进控制研究

扫码查看
盾构始发是地铁隧道施工的关键环节之一,具有风险大、防水任务重、土体扰动强的特点.以天津市滨海新区B1 线欣嘉园东站~欣嘉园站区间盾构始发为例,基于薄板理论确定了始发端的软黏土加固范围,并针对穿越软黏土的力学特点,提出"三轴搅拌桩+2 排高压旋喷桩"的联合加固方案,并分析了始发端的掘进控制参数,运用现场实测方法得到了地表沉降曲线.结果表明,土体加固方案可满足加固土体的抗剪切、抗拉和盾尾部防渗要求;加固区掘进推力≤1 200 kN,推进速度≤10 mm/min,刀盘转速≤1 r/min;非加固区掘进推力≤3 000,推进速度 30~40 mm/min,刀盘转速1~1.51 r/min;监测表明最大地表沉降发生在掘进掌子面附近,掌子面前方2 倍掘进长度后的地表沉降趋近于0;地表沉降峰值随着掘进长度的增加而增加,在盾壳尾部脱离加固区时,地表沉降的速率增加较快.
Research on Reinforcement and Excavation Control of the Launching Hole of Subway Shield Tunnels in Soft Clay
Shield tunneling is one of the key links in subway tunnel construction,characterized by high risks,heavy waterproofing tasks,and strong soil disturbance.Taking the shield tunneling starting from Xinjiayuan East Station to Xinjiayuan Station on Line B1 of Binhai New Area in Tianjin as an example,the reinforcement range of soft clay at the starting end was determined based on the thin plate theory.A joint reinforcement scheme of'three-axis mixing pile+2-row high-pressure rotary jet grouting pile'was proposed according to the mechanical characteristics of crossing soft clay,and the excavation control parameters at the starting end were analyzed.The surface settlement curve was obtained using on-site measurement methods.The results show that the soil reinforcement scheme can meet the requirements of shear resistance,tensile strength,and anti-seepage of the reinforced soil at the tail of the shield;reinforcement area excavation thrust≤1 200 kN,propulsion speed≤10 mm/min,cutter head speed≤1 r/min;non reinforced area excavation thrust≤3 000,the advance speed is30-40 mm/min,and the speed of the cutterhead is 1-1.51 r/min;the monitoring shows that the maximum surface settlement occurs near the excavation face,and the surface settlement in front of the tunnel face approaches 0 after twice the excavation length;the peak value of surface subsidence increases with the increase of excavation length,and the rate of surface subsidence increases rapidly when the tail of the shield shell detaches from the reinforcement area.

soft claysubway shield tunnelingthree-axis mixing pilereinforcement at launching holeexcavation control

成航宇

展开 >

中铁十八局集团第五工程有限公司 天津 300459

软黏土 地铁盾构 三轴搅拌桩 始发端加固 掘进控制