扫码查看
由于城市双孔隧道施工的复杂性,隧道开挖对地表沉降的预测及控制成为一个亟待解决的问题.本文基于传统随机介质理论,利用极坐标转换,得到双孔隧道施工地表沉降规律公式.以广州某双孔隧道施工为例,对采用CRD法、CD法和双侧壁法施工的双孔隧道,分别建立PLAXIS 3D模型,并将其理论预测值与数值模拟值进行对比分析.研究结果:不同工法下地表沉降预测结果整体趋势与数值结果基本吻合;采用CD工法和CRD工法引起的最大地表沉降理论值与数值模拟值较为吻合,双侧壁导坑工法下的双孔隧道施工引起的地表沉降的随机预测解与数值模拟解相差最大.
Random Prediction Method of Ground Settlement Caused by Double-Hole Tunnel Construction Under Different Construction Methods
Due to the complexity of urban twin-bore tunnel construction,the prediction and control of surface settlement by tunnel excavation has become an urgent problem.In this paper,based on the traditional random medium theory,the surface settlement law formula for twin-bore tunnel construction is obtained by using polar coordinate transformation.Taking the construction of a twin-bore tunnel in Guangzhou as an example,the PLAXIS 3D model is established for the twin-bore tunnel constructed by CRD method,CD method and double sidewall method,and the theoretical prediction value is compared and analyzed with the numerical simulation value.The results of the analysis are as follows:the overall trend of the surface settlement prediction results under different methods is basically consistent with the numerical results.The theoretical values of the maximum surface settlement under the CD and CRD methods are in good agreement with the numerical simulation values.The stochastic prediction solution for surface settlement due to twin-bore tunnel construction under the double sidewall guide pit method has the largest difference from the numerical simulation solution.

double-line tunnelground subsidencerandom medium theorynumerical simulationcomparative analysis

徐峰

展开 >

中铁十二局集团有限公司 山西太原 030024

双线隧道 地表沉降 随机介质理论 数值模拟 对比分析

中铁十二局集团有限公司科技研发计划

集团2018 研34号

2024

铁道建筑技术
中国铁道建筑总公司

铁道建筑技术

影响因子:0.539
ISSN:1009-4539
年,卷(期):2024.(4)