Research on Quality Management of Railway Engineering Survey and Design Under the New Situation
Railway engineering has the characteristics of wide construction area,complex project environment,and many sub-projects.At present,all participating units strictly abide by the principle of"survey firstly,design secondly,construction lastly".Therefore,the survey and design work as the"navigator"of the whole railway construction engineering,the quality of its results to a great extent affect the later construction quality and railway operation safety.This paper takes the national quality strategy and the railway industry supervision situation as the breakthrough point,which based on the perspective of survey and design enterprise,analyzing and studying the quality control problems that existing in different stages of survey,design and construction.It also puts forward management measures and suggestions for improving the quality of railway project survey and design,which can provide certain reference for the quality management of railway engineering survey and design in the future.
railway engineeringsurvey and designquality management