首页|特长隧道通风参数优化及粉尘运移规律研究

特长隧道通风参数优化及粉尘运移规律研究

扫码查看
施工过程中隧道内粉尘扩散对人员安全以及工期有较大影响,特别是长大隧道掘进中选择合理的通风系统布置参数是隧道高效、经济施工的基础.以宝坪高速公路天台山隧道为研究背景,运用流体力学数值软件建立三维数值模型,计算不同通风速度、风管直径、出风管口距掌子面的距离以及风管的悬挂位置条件下粉尘在隧道内的运移规律,并进行了现场实践.研究结果表明:送风风速过大过小都不利于粉尘排出隧道,送风风速最优为 30 m/s;风管直径对隧道内粉尘运移有重要影响,风管直径越大,初始射流越大,风流量越大,越有利于通风除尘;风管出口距掌子面距离越远,消耗能量越多,越不容易将粉尘携带出洞外;风管应设置在隧道拱肩处,粉尘不易聚集在掌子面处,有利于粉尘排除和隧道安全施工.
Study on Ventilation Parameter Optimization and Dust Migration Rule of Extra-Long Tunnel
The dust diffusion in the tunnel during construction has a great impact on the safety of personnel and the construction period.Especially in the excavation of long tunnels,selecting reasonable ventilation system layout parameters is the foundation for efficient and economical construction of the tunnel.This article took the Tiantai Mountain Tunnel of Baoji-Pingkan Expressway as the research background,used the fluid mechanics numerical software to establish a three-dimensional numerical model for calculating the migration rule of dust in the tunnel under different ventilation speeds,duct diameter,distance from the outlet of the duct to the tunnel face,and the suspension position of the duct,and conducted on-site practice.The research results indicate that both too high and too low supply wind speeds are not conducive to dust discharge from the tunnel,and the optimal wind supply speed is 30 m/s;the diameter of wind ducts has a significant impact on dust migration in the tunnel.The larger the diameter of the wind duct,the larger the initial jet and the greater the wind flow,which is more conducive to ventilation and dust removal;the farther the wind duct outlet is from the tunnel face,the more energy is consumed and it is less likely to carry dust out of the hole;the wind duct should be installed at the arch shoulder of the tunnel,so that the dust is not easily accumulated at the working face,which is conducive to dust removal and safe tunnel construction.

highway tunnelpipeline arrangementnumerical calculationconstruction dustmigration rule

程凯

展开 >

中铁十二局集团第二工程有限公司 山西太原 030032

公路隧道 管道布置 数值计算 施工粉尘 运移规律

中铁十二局集团有限公司科研课题

集团2018研-2-13号

2024