The Necessity of Capacity Expansion and Transformation of Jiamusi-Tongjiang Railway Based on the Development of Tongjiang Railway Port
At the end of 2022,the Tongjiang Railway Bridge has been officially opened and put into operation.Together with Manchuria and Suifenhe railway ports,they form the three major railway ports in Northeast China that are open to Russia.Jiamusi-Tongjiang Railway,as a necessary rear passage for communication and exchange between Tongjiang Port and inland areas,has problems such as low technical standards and saturation of capacity utilization in multiple sections,which are bottlenecks for the future development of Tongjiang Railway Port.Based on the study of the development of Tongjiang Railway Port,this article analyzed the positioning,radiation range and transportation volume of Tongjiang Railway Port,and then studied the transportation volume and capacity expansion and transformation plan of its rear channel Jiamusi-Tongjiang Railway.Finally,the article analyzed the necessity of the expansion and transformation of Jiamusi-Tongjiang Railway from the perspectives of responding to the 'the Belt and Road Initiative',China's energy import diversification,promoting the development of Tongjiang Railway Port,supplementing the shortcomings of the road network,and prospering the border and enriching the people.
Tongjiang Railway PortJiamusi-Tongjiang Railwaytraffic volume predictioncapacity expansion and transformationnecessity