首页|高速铁路客运站房碳排放计算方法及减碳策略研究

高速铁路客运站房碳排放计算方法及减碳策略研究

扫码查看
基于对全球气候变化的应对需求和我国"双碳"目标,以西安东站为案例,采用能源消耗分析和碳排放因子法,明确了客运站房运营阶段的主要碳排放源,提出了高速铁路客运站房在运营阶段的碳排放计算方法,包括客运站房计算范围、数据收集方法、碳排放计算公式、碳排放因子调整机制以及结果跟踪.分析了西安东站当前的减碳技术应用,并从技术升级、能源监测与优化管理、可再生能源使用扩展、绿色运营策略以及碳足迹追踪与目标管理等方面,详细探讨了高速铁路客运站房的长效减碳多维策略.
Carbon Emission Calculation Methods and Reduction Strategies for High-Speed Railway Passenger Station
In response to global climate change and China's'dual carbon'target,taking the Xi'an East Railway Station as the research case,the energy consumption analysis and the carbon emission factor method are employed.The main sources of carbon emissions during the passenger station's operation are determined.A carbon emission calculation method is put forward for high-speed railway passenger stations during operation,including calculation region of the passenger station,data collection methods,carbon emission calculation formulas,carbon emission factor adjustment mechanisms and result tracking.Furthermore,the current carbon reduction technologies applied at Xi'an East Railway Station are introduced.And the multi-dimensional strategies for achieving long-term emission reductions in high-speed railway passenger stations are explored,such as technological upgrades,energy monitoring and optimization management,expansion of renewable energy use,green operational strategies,carbon footprint tracking and target management.

passenger stationcarbon emission calculationcarbon reduction strategycarbon emission factorenergy consumption data collection

王智

展开 >

中铁建设集团有限公司 北京 100040

客运站房 碳排放计算 减碳策略 碳排放因子 能耗数据收集

2024

铁道建筑技术
中国铁道建筑总公司

铁道建筑技术

影响因子:0.539
ISSN:1009-4539
年,卷(期):2024.(9)