节理的存在对隧道爆破超欠挖的控制有着巨大的影响,以瓷都隧道为工程依托,采集现场周边孔爆破数据,对节理倾角为60°时隧道周边孔进行参数优化,利用有限元软件对优化前后的两种隧道模型进行数值仿真,对爆破岩体损伤及超欠挖进行分析.并进行现场爆破试验,利用全站仪对隧道爆破后的超挖量进行测量,验证数值结果的正确性.试验结果表明:优化后的周边孔爆破效果更好,隧道超挖量明显得到控制,上台阶断面平均超挖量降低了65.25%、平均炸药单耗量降低了13.1%.本研究给节理岩体隧道超挖精准控制提供了方法支撑,具有工程指导意义.
Research on Optimization of Blasting Parameters and Over-Excavation Control of Peripheral Holes in Jointed Rock Mass Tunnel
The existence of joints has a huge impact on the control of tunnel blasting over-under-excavation,based on the Cidu Tunnel,the blasting data of the surrounding holes on the site were collected,the parameters of the peripheral holes of the tunnel were optimized when the joint inclination angle was 60°,and the two tunnel models before and after optimization were numerically simulated by software to analyze the damage and over-under-excavation of the blasted rock mass.The on-site blasting test was carried out,and the total station was used to measure the over-excavation amount of the tunnel after blasting to verify the correctness of the numerical results.The test results show that the blasting effect of the optimized perimeter hole is better,the over-excavation amount of the tunnel is obviously controlled,the average over-excavation amount of the upper step section is reduced by65.25%,and the average unit consumption of explosives is reduced by 13.1%.This study provides a method support for the precise control of over-excavation of jointed rock mass tunnels,and has engineering guiding significance.

jointed rock mass tunnelover-excavationparameter optimizationon-site test

伍军

展开 >

中铁十七局集团有限公司 山西太原 030006

节理岩体隧道 超挖 参数优化 现场试验

2024

铁道建筑技术
中国铁道建筑总公司

铁道建筑技术

影响因子:0.539
ISSN:1009-4539
年,卷(期):2024.(9)