首页|香港粉岭高架曲线桥悬臂浇筑挂篮响应分析

香港粉岭高架曲线桥悬臂浇筑挂篮响应分析

扫码查看
以香港粉岭项目高架桥为工程背景,建立曲线桥悬臂浇筑施工菱形挂篮三维有限元模型,考虑多种施工荷载和不同施工工况,从强度、刚度和稳定性方面对其开展结构响应分析.研究结果表明,不同施工阶段的挂篮结构响应均可满足现行规范要求,其中在首节梁段混凝土浇筑完成后,挂篮的导梁系统、吊杆吊带以及后锚梁的安全储备相对较小,在实际施工时需进行重点监测;相比之下,在行走过程中挂篮各构件安全储备则均处于较高水平.此外,由于悬臂浇筑结构为曲线梁,相比于曲线内侧挂篮,曲线外侧挂篮受力最大可增加约20%.
Response Analysis of the Hanging Basket for Cantilever Casting the Curved Bridges of the Fanling Viaduct in Hong Kong
Selecting the Fanling Viaduct in Hong Kong as the engineering background,the three-dimension finite element model of the rhombic hanging basket for cantilever casting curved girders is established,and the structural response analysis is implemented considering various loads and different cases in the aspects of strength,stiffness,and stability.Results show that responses of the rhombic hanging basket can meet the requirements of the current codes under different construction stages.When the concreting is done for the first segment,safety margins of the guide beam system,the suspension rods,and the rear anchor beam of the rhombic hanging basket are relatively small,thus key monitoring should be carried out on these areas during actual construction.In contrast,safety margins of the rhombic hanging basket components are at a relatively high level under the moving process.Furthermore,as the cantilever casting structure being a curved beam,compared to the hanging basket on the inner side of the curve,the maximum force on the hanging basket on the outer side of the curve can be increased by about 20%.

cantilever castingcurved girderrhombic hanging basketstructural responsenumerical analysis

杨志

展开 >

中铁十五局集团建筑装配科技有限公司 江苏南京 210031

悬臂浇筑 曲线梁 菱形挂篮 结构响应 数值分析

2024

铁道建筑技术
中国铁道建筑总公司

铁道建筑技术

影响因子:0.539
ISSN:1009-4539
年,卷(期):2024.(10)