首页|深圳市南光高速北延松岗互通立交方案优化分析

深圳市南光高速北延松岗互通立交方案优化分析

扫码查看
以实际工程为案例,原设计方案多次下穿高速公路路基,造成工程造价高,实施难度大。方案优化后,减少了四次下穿,节省投资约3。2亿元,并大大降低了施工难度。
Scheme Optimization Analysis of Songgang Interchange of Nanguang Expressway North Extension in Shenzhen
In this paper,taking the actual project as an example,the original design scheme crosses the highway sub-grade many times,resulting in high project cost and difficult implementation.After the optimization of the scheme,four underpasses were reduced,the investment was saved by about 320 million yuan,and the con-struction difficulty was greatly reduced.

interchangescheme optimizationsave investmentmain line confluenceleft confluence

郝强

展开 >

天津市政工程设计研究总院有限公司,天津 300392

互通立交 方案优化 节省投资 主线合流 左侧合流

2024

天津建设科技
天津市建设科技信息中心 天津市市政工程研究院

天津建设科技

影响因子:0.299
ISSN:1008-3197
年,卷(期):2024.34(6)