Safety Risk Analysis and Prevention Measures for Offshore Platform Power Expansion and Renovation Project
In order to meet the requirements of stable production,a platform in Bohai plans to add a domestically produced micro turbine to solve the power bottleneck problem of the platform based on the development plan of the oil field.The focus is on identification of the construction safety risks during the construction process of power expansion and renovation.Through safety risk analysis,targeted safety construction management measures are proposed.