首页|在建浮式生产储油船非完整状态下起浮坐墩的可行性分析

在建浮式生产储油船非完整状态下起浮坐墩的可行性分析

扫码查看
以实际工程项目为例,全面考虑浮式生产储卸油装置(FPSO)未完工情况下的建造状态,结合以往经验,制定起浮坐墩各阶段实施方案,并采用有限元分析软件,分析FPSO在不同工况下的应力和变形,研究其在非完整状态下起浮坐墩的可行性.
Feasibility Analysis of Floating or Resting on Blocks in Incomplete State of Floating Production Storage and Offloading Unit under Construction
Taking the actual project as an example,the construction state of floating production storage and offloading(FPSO)unit in the case of incomplete construction is comprehensively considered.Combined with the previous experience,the implementation schemes of each stage of floating or resting on blocks are developed,and the stress and deformation of the FPSO under different working conditions are analyzed by the finite element analysis software,and the feasibility of floating or resting on blocks in incomplete state of FPSO is studied.

floating production storage and offloading unitengineering projectfloating or resting on blocksincomplete state

金本领、郑晓涛、杜凯乐、张胜宝

展开 >

中海油能源发展股份有限公司采油服务分公司 天津 300452

浮式生产储卸油装置 工程项目 坐墩起浮 非完整状态

2024

天津科技
天津科学技术信息研究所

天津科技

影响因子:0.253
ISSN:1006-8945
年,卷(期):2024.51(4)
  • 4