阐述浮式生产储卸油装置(FPSO)单点系泊系统锚桩的海上安装程序,通过优化作业步骤、改进作业工具等,统筹兼顾,提高锚桩海上施工效率,为今后类似锚桩海上安装作业流程的优化提供借鉴.
Abstract
This paper describes the offshore installation procedure of anchor piles of FPSO(Floating Production Storage and Unloading Unit)single point mooring system.Through reasonable optimization of the procedure,improvement of operation tools and overall consideration,the offshore construction efficiency of anchor piles is improved,thus providing a basis for the optimization of similar offshore installation operation process of anchor piles in the future.
关键词
浮式生产储卸油装置(FPSO)/系泊/锚桩/海上安装Key words