首页|天府至朝阳湖铁路隧道底鼓变形机理分析及工程处理措施

天府至朝阳湖铁路隧道底鼓变形机理分析及工程处理措施

Analysis of Deformation Mechanism of Floor Heave of Tianfu-Chaoyanghu Railway Tunnel and Engineering Treatment Measures

扫码查看
我国高速铁路大多速度目标值为 350 km/h,大部分轨道形式以无砟为主.在我国西南红层地区局部隧道发生了基底隆起(底鼓),威胁高速铁路的运营安全,有必要对隧道底鼓变形特征、变形机理、工程处理措施进行研究.通过深入研究线路基底隆起的工程特性,为工程设计与施工提供指导和依据,确保工程建设质量、安全及经济性.
Most high-speed railways in China have a target speed value of 350 km/h,with most of the tracks being ballastless.Local tunnels in the red layer area of southwestern China have experienced base uplift(floor heave),which poses a threat to the operation safety of high-speed railways.Therefore,it is necessary to study the deformation characteristics,deformation mechanism,and engineering treatment measures of tunnel floor heave.The engineering characteristics of the base uplift of this line are studied to provide guidance and basis for the design and construction of the project,and ensure the quality,safety,and economy of the construction.

Tianfu-Chaoyanghu railwayfloor heaverheologycreepengineering treatment measures

李鹏

展开 >

中国铁路设计集团有限公司 天津 300142

天朝铁路 底鼓 流变 蠕变 工程处理措施

2024

天津科技
天津科学技术信息研究所

天津科技

影响因子:0.253
ISSN:1006-8945
年,卷(期):2024.51(12)