首页|西延高铁隧道排水系统结晶堵塞机理研究

西延高铁隧道排水系统结晶堵塞机理研究

扫码查看
基于西延高铁隧道的排水系统结晶堵塞现场勘察与调研情况,以宜君隧道和武家塬隧道为例,对地下水、结晶物、喷混凝土外层渗水、建筑材料等取样分析,明确结晶物的主要组分与形成机理.研究表明,白、灰色结晶沉淀物堵塞位置主要位于环向盲管出水口,管口水流小,堵塞严重,白色结晶物的主要成分为CaCO3,少量灰色结晶为掺杂混凝土的碳酸盐,结晶物中Ca2+主要来自喷射混凝土中水泥的水化产物,CO32-主要来源于地下水中的矿化离子.因此,隧道排水管中结晶过程包括3个阶段:地下水对喷射混凝土的渗透过程;混凝土中钙的溶出过程;排水管中的晶体沉积过程,为隧道排水系统结晶堵塞灾害的预防和治理提供理论基础.
Crystallization Blockage Mechanism in Drainage System of Xi'an-Yan'an HSR Tunnel
Based on the on-site survey and investigation of crystallization blockage in the drainage system of Xi'an-Yan'an HSR Tunnel,taking Yijun Tunnel and Wujiayuan Tunnel as examples,this paper samples and analyzes groundwater,crystals,shotcrete outer layer seepage and building materials,and clarifies the main components and formation mechanism of crystals.The study shows that the blockage position of white and gray crystalline deposits is mainly located at the outlet of the circumferential blind pipe,with small water flow at the nozzle and serious blockage.The main component of white crystal is CaCO3,and a small amount of gray crystal is carbonate mixed with concrete.In the crystal,Ca2+mainly comes from the hydration product of cement in shotcrete,and CO32-mainly comes from mineralized ions in groundwater.Therefore,the crystallization process in tunnel drainage pipe includes 3 stages:penetration process of groundwater to shotcrete;dissolution process of calcium in concrete;crystal deposition process in drainage pipe,which provides a theoretical basis for prevention and treatment of crystallization blockage hazards in tunnel drainage system.

Xi'an-Yan'an HSRtunneldrainage system blockagecrystalcrystallization mechanism

郭光旭、党珂、韩明虎

展开 >

西成铁路客运专线陕西有限责任公司,陕西西安 710000

中国铁路西安局集团有限公司,陕西西安 710054

兰州交通大学光电技术与智能控制教育部重点实验室,甘肃兰州 730070

西延高铁 隧道排水 排水系统堵塞 结晶物 结晶机理

2024

铁路技术创新
中国铁道科学研究院

铁路技术创新

影响因子:0.409
ISSN:1672-061X
年,卷(期):2024.(1)
  • 7