Integrated Construction and Operation of PV Power Generation at Xiongan Railway Station and Its Benefit Analysis
In light of the review comments on the preliminary design of distributed PV power generation at Xiongan Railway Station,the paper first analyzes the operation and development bidding cooperation mode,the construction management,O&M management,and operation benefits of the project.Secondly,the paper extracts the key points in the implementation stage of PV power generation system in railway passenger stations and summarizes important experience in successful cases of PV power generation systems at Xiongan Railway Station.According to the benefit analysis,the total annual power generation of roof PV power generation at Xiongan Railway Station is about 5.8 million kW·h,which can reduce carbon dioxide emissions by 4 500 t.This study can provide a decision-making reference for the application of PV power generation system in railway projects,as well as guidance for the future integrated construction and operation of distributed PV power generation and railway passenger stations,and promote the use of environmentally friendly green energy in railway passenger stations.
Xiongan Railway Stationdistributed PV power generationintegrated constructionO&M managementbenefit analysis