首页|BIM模型与数据资产关系的若干思考

BIM模型与数据资产关系的若干思考

扫码查看
BIM模型在作为数据资产识别过程中因"数据资源持有权""数据资源加工权""数据资源经营权"三权不能满足及不能明确给企业带来经济利益预期的限制,BIM模型作为数据资产入表有较多的困难.通过将BIM模型转化成全量数据库,可以较好地解决上述问题.本文基于BIM模型面对资产识别的困难,利用全量数据库的解决方法进行阐述,论证以数据模型替代BIM模型进行数据资产认证的可行性和经济性,对BIM模型的数据价值的研究具有借鉴作用.
Several Thoughts on the Relationship Between BIM and Data Assets
In the process of identifying data assets,BIM face difficulties in being listed as data assets due to the inability to satisfy the three rights of"data resource ownership","data resource processing rights",and"data resource management rights",as well as the inability to clearly define the expected economic benefits to the enterprise.By converting BIM into a full-scale database,the above problems can be effectively solved.This article will elaborate on the difficulties of asset identification using BIM and the methods of using full-scale databases to solve them,demonstrating the economic feasibility of using data models instead of BIM for digital asset authentication,which is useful for the research of data value of BIM model.

BIM Full-scale DataBuilding Digital ResourcesBuilding Digital AssetsIdentification of Building Digital Assets

李智、王大川、邓颖、杨晓宇

展开 >

数云科际(深圳)技术有限公司,深圳 518063

BIM模型全量数据 建筑数据资源 建筑数字资产 建筑数字资产识别

2024

土木建筑工程信息技术
中国图学学会

土木建筑工程信息技术

影响因子:0.933
ISSN:1674-7461
年,卷(期):2024.16(6)