Comparative Analysis of the Impact of π-Connected or T-Connected Existing Power Lines on the Power Grid in New Energy Stations
By comparing and analyzing the π-type access and T-type access schemes adopted by new energy stations,evaluate their impact on the stability and transmission efficiency of the existing power grid.The article first outlines the technical principles of two access methods;Secondly,the economic benefits and engineering implementation difficulties of the two schemes were discussed,providing decision-making references for selecting new energy access methods under different conditions;Finally,some suggestions and improvement measures were proposed to optimize the new energy access strategy,balance economic benefits and grid stability.
new energy accesspower grid impactπ-type accessT-shaped accesstransmission efficiencyeconomic benefits