首页|EPC总承包模式下重大工程供应链风险识别——基于扎根理论的探索

EPC总承包模式下重大工程供应链风险识别——基于扎根理论的探索

扫码查看
风险识别是EPC总承包模式下重大工程供应链风险管理的基础工作,有助于指导风险评价与应对等后续工作,以降低风险事件产生的不利影响.本文运用扎根理论的定性研究方法,借助利益相关者理论和项目全生命周期理论,通过专家访谈、案例分析和文献研究三种方式,经过资料收集、三级编码、理论饱和度检验等操作流程,提炼出211个初始概念、36个子范畴、12个主范畴和1个核心范畴.研究结果显示,EPC总承包模式下重大工程供应链风险因素体系包括12个一级风险因素和36个二级风险因素,嵌入7个风险参与主体和8个风险产生阶段,最终构建EPC总承包模式下重大工程供应链风险因素指标体系的二维平面链式结构理论模型.
Risk Identification of Mega Infrastructure Construction Supply Chain in Engineering-Procurement-Construction Projects:A Grounded Theory Approach
Risk identification is the groundwork of risk management for mega infrastructure construc-tion supply chain in engineering-procurement-construction projects(MICSC in EPCs),which helps to guide the follow-up work of risk evaluation and response to reduce the adverse impact of risk events.This paper applied the qualitative research method of grounded theory drawing on stakeholder theory and project life cycle theory and utilizing three ways of expert interview,case analysis,and literature review,211 initial concepts,36 subcategories,12 main categories,and 1 core category were refined after the operational processes of data collection,three-level coding and theoretical saturation test.The results show that the risk factor system of MICSC in EPCs includes 12 primary risk factors and 36 sec-ondary risk factors,embedded in 7 risk participating subjects and 8 risk generating phases.A theoreti-cal model of two-dimensional planar chain structure of the risk factor indicator system of MICSC in EPCs was constructed ultimately.

Engineering-Procurement-Constructionmega infrastructure construction supply chainrisk identificationgrounded theory

于润泽、马力

展开 >

大连理工大学 建设管理系,辽宁 大连 116024

EPC总承包模式 重大工程供应链 风险识别 扎根理论

辽宁省社会科学基金重点项目

L23AGL010

2024

土木工程与管理学报
华中科技大学

土木工程与管理学报

CSTPCDCHSSCD
影响因子:0.837
ISSN:2095-0985
年,卷(期):2024.41(2)