通过对客车焊装产线进行流水节拍优化、对人员和场地进行调整,缩短车间物流路线的同时让车间质量得到稳定的提升,可以持续为企业降本增效.成立项目小组测量工位标准车型工时(指定FBC6127BRZ3),通过山积表数据分析车间工位瓶颈,把瓶颈工序通过技术工艺手段进行疏解,达到降本增效目的.
Optimization of Flow Rate in Welding Line
By optimizing the flow beat of the bus welding production line,adjusting the personnel and site,shortening the logistics route of the workshop and improving the quality of the workshop steadily,we can continue to reduce costs and increase efficiency for the enterprise.The project team was set up to measure the working hours of standard models(designated FBC6127BRZ3),analyze the bottlenecks of the workshop through the data of the Yamazaki table,and solve the bottleneck processes through technical and technological means to achieve the purpose of reducing costs and increasing efficiency.