首页|D公司柔性作业车间调度优化研究

D公司柔性作业车间调度优化研究

扫码查看
以D公司柔性作业车间作为研究对象,以最小化最大完工时间、最小化机器负载和最小化机器能耗为目标建立优化模型,并采用改进的NSGA-Ⅱ算法进行求解,得出优化后的调度方案.与优化前方案相比,完工时间缩短了 7.68%,机器负载减少了 17.7%,总能耗减少了 11.39%,提高了企业的生产效益,可以为企业制定高效的调度方案提供一定的参考.
Optimization Study of Flexible Job Shop Scheduling in Company D
Taking the flexible workshop of Company D as the research object,an optimization model is established with the objectives of minimizing the maximum completion time,minimizing the machine load and minimizing the energy consumption of the machine,and the improved NSGA-Ⅱ algorithm is used to solve the problem,which results in the optimized scheduling plan.Compared with the pre-optimization scheme,the completion time is shortened by 7.68%,the machine load is reduced by 17.7%,and the total energy consumption is reduced by 11.39%,which improves the production efficiency of the enterprise,and it can provide a certain reference for the enterprise to formulate the efficient scheduling scheme.

flexible job shopNSGA-Ⅱ algorithmmulti-objectivescheduling program

张洪

展开 >

山东科技大学,山东 青岛 266590

柔性作业车间 NSGA-Ⅱ算法 多目标 调度方案

2024

现代工业经济和信息化

现代工业经济和信息化

影响因子:0.485
ISSN:
年,卷(期):2024.14(4)
  • 6