首页|风电场"以大代小"项目经济评价方法与应用

风电场"以大代小"项目经济评价方法与应用

扫码查看
结合老旧风电场改造升级项目经济评价中常见的问题与难点,探讨了风电场"以大代小"项目经济评价的方法,针对可能存在的可再生能源补贴获取情况、原项目债务、技改时间点选择等影响因素,采用增量法与总量法相结合的方法,全面分析项目经济性,并通过案例分析进行验证.最后,提出了优化项目经济性的建议,旨在为同类型项目的经济评价和投资决策提供参考.
Method and Application of Economic Evaluation of Wind Farm Project"Replacing Small with Big"
Combined with the analysis of common problems and difficulties in the economic evaluation of old wind farm renovation and upgrading projects,this paper discusses the economic evaluation method of wind farm"replacing small with large"projects.In view of the possible influencing factors such as the acquisition of renewable energy subsidies,the original project debt,and the selection of technical transformation time point,the incremental method and the total amount method are adopted to comprehensively analyze the project economy.It is verified by case analysis.Finally,some suggestions are put forward to optimize the economy of the project,aiming at providing reference for the economic evaluation and investment decision of the same type of project.

reconstruction and expansion projectwind farmseconomic evaluationincremental income

兰婧、胡芳

展开 >

龙源(北京)新能源工程设计研究院有限公司,北京 100034

改扩建项目 风电场 经济评价 增量收益

2024

现代工业经济和信息化

现代工业经济和信息化

影响因子:0.485
ISSN:
年,卷(期):2024.14(6)
  • 5