Application of the Reinforcement Technology of"Pipe Jacking Curtain+Grouting Improvement+Soil Freezing"
In order to better solve the problem of excavation of coastal underground engineering in the complex environment of high-water level,the research analyzed and summarized the key construction technologies and core processes such as the con-struction of the pipe jacking curtain of the tunnel under the excavation section,the improvement of soil grouting,the monitoring and measurement,aiming to reasonably control safety,quality,progress,cost,environmental protection and other as-pects of the project,and provide reference for the construction of ultra shallow buried and concealed tunnels.
super shallow buried high rich waterupper and lower layered highway tunnelscurvy pipe jacking curtaingrouting improvement